Product Description
![Wheel Hub Electrophoresis Full Automatic/Robot Powder Coating Line/Painting Machine /Spraying System](//www.micstatic.com/athena/img/transparent.png)
* 30+ years in powder coating equipment manufacturing.
* Expert on Perfect Solution for Your Powder Coating Plant.
Our Main Products:
Manual powder coating machine, Automatic powder coating line, Spray painting equipment, Pretreatment System, Drying Oven, Powder Spraying Gun, Reciprocator, Fast Automatic Color Change Equipment, Powder Coating Booth, Powder Recovery Equipment, Conveyor Chains, Curing Oven, etc. All the systems are widely used on the applications of automotive, home and office appliance, machines industry, metal fabrications and so on.And through to CE, ISO 9001 standards.
*Pollution free operation
*Safe to operate
*Maximum recovery efficiency
*Durability
*Quick color change
The pre treatment
Pre-treatment:
The shed is made of stainless steel, beautiful and durable, with a high degree of automation, and is equipped with a moisture drainage system to prevent solution overflow.
Powder Coating System:
Robot automatic spraying, faster, consistent layer thickness, can be programmed offline, easy to control, greatly saving costs.
![Wheel Hub Electrophoresis Full Automatic/Robot Powder Coating Line/Painting Machine /Spraying System](//www.micstatic.com/athena/img/transparent.png)
Conveyor chains:
1.Easy to install and disassemble, low failure rate
2.PLC control, adjustable speed, suitable for different workpieces
Powder Coating Booth
fast color change with big cyclone and secondry recovery system
advantages:
* Powder recovery rate as high as 99.2%
* Color change time: 10-15 minutes
* Suitable for multiple color more than 3
* No dust spillover, reduce powder waste
* Save labor time
* Improve the quality of spraying
The process of automatic line
No. |
Process Name |
Process Parameter |
Mode |
Remarks |
Temperature |
Time |
1 |
Loading |
RT |
|
|
|
2 |
Pre treatment |
35-50ºC |
15-20 min |
Automatic |
Adjustable |
3 |
Drying Oven |
100-120ºC |
15-20 min |
Automatic |
Adjustable |
4 |
Cooling |
RT |
5-10 min |
|
|
5 |
Powder coating |
RT |
3-5min |
Automatic and Manual |
Adjustable |
6 |
Curing |
200-220ºC |
30-35 min |
Automatic |
Adjustable |
7 |
Cooling |
RT |
10-15 min |
|
|
8 |
Unloading |
RT |
|
|
|
Project cases:
![Wheel Hub Electrophoresis Full Automatic/Robot Powder Coating Line/Painting Machine /Spraying System](//www.micstatic.com/athena/img/transparent.png)
Company introduction:
Team and Certificates![Wheel Hub Electrophoresis Full Automatic/Robot Powder Coating Line/Painting Machine /Spraying System](//www.micstatic.com/athena/img/transparent.png)
How does the order flow:
![Wheel Hub Electrophoresis Full Automatic/Robot Powder Coating Line/Painting Machine /Spraying System](//www.micstatic.com/athena/img/transparent.png)
FAQ
Are you a trader or a factory?
We are manufacturer and exporter.
Our own factory was found in 1998,Our export office was established in 2014.
What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee, reasonably determines and divides the stages of design,
production, installation and commissioning, and formulates detailed progress plans for each stage,
Strengthen the quality assurance system and quality protection measures of equipment
manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment
maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the
customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the
device remotely through the computer network through the authorization given by the customer, and
eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.
Feel free to contact with us to get your design .