Customization: | Available |
---|---|
After-sales Service: | Video and Overseas Service |
Warranty: | 2 Years Spare Parts for Free |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
2025 Project Shotblast Pretreatment for Fire Pipe Powder Spraying Coating System Line
Offer clients complete and cohesive solutions for Coating Production Lines!!!
24h technical and business service
30+ years experience in powder coating industry
200+ professional technicians, engineers and workers
300+ projects in China and around the world
To bring a customized SUCCESSFUL project for you!
01 Brief Introduction of 2025 Project Shotblast Pretreatment for Fire Pipe Powder Spraying Coating System Line
Shot Blasting Pretreatment for Powder Coating
Shot blasting cleans and profiles surfaces by propelling abrasives at high speed, removing rust, scale, and contaminants. It creates a textured surface for better coating adhesion, is eco-friendly (no chemicals), and works on metals like steel and aluminum.
Benefits:
Improves coating durability.
Reduces waste and chemical use.
Suitable for complex shapes and heavy-duty applications.
Ideal for efficient, high-quality powder coating preparation.
Technological process | Item | Technological process | Item |
Water Rinse | 0.5-1 mins | High pressure DI Rinse | 0.5-1 mins |
Pre degrease | 1.5-2 mins | ||
Degrease | 2.5-3 mins | Silane/phosphating | 2.5-3 mins |
DI Rinse | 0.5-1 mins |
02 Real Project Cases
Process Name | Mode | Temperature(ºC) | Time | Remark |
Loading | Manual | RT | 2-5mins | |
Pre-heating | Automatic | 300-350 | 6-10mins | |
Dipping Coating | Automatic | RT | 3-5mins | |
Curing | Automatic | 180-220 | 3-5mins | |
Cooling | Automatic | RT | 10-15mins | |
Unloading | Manual | RT | 3-5mins | |
Inspection&Package |
Type | Item | Specification |
Bridge curing oven And Tunnel curing oven |
Conveyor chain speed | Adjustment according to work piece specification |
Furnace temperature | 180-220°adjustable | |
Heating time | ≤35mins,usually 15-20mins | |
Temperature rise curve | Work piece at room temperature to 200°,5-6mins,curing 10-12mins | |
Heat energy | Gas,electricity,LPG,diesel,multiple options |
Fast auto color change Powder coating booth | Parameters | Fast auto color change Powder coating booth | Parameters |
Material of the booth | PP or PVC | Powder recovery system | Large cyclone with secondary recovery unit |
Size of the booth | Design matching | Powder recovery rate | 99.2% |
Reciprocator | Design matching | Powder recovery time | 10-15 mins |
Powder coating gun | Gema,Nordson,ZY | Size of the large cyclone | Φ1m,H4.8m,customized |
Lighting | LED | Electrical control center | Design matching |
Since 1990, Zhyao has evolved from simple manual spraying to advanced automatic powder spraying and dipping systems. We are dedicated to providing innovative, rational, and economical solutions, supported by cutting-edge technologies. As a trusted partner, we deliver the best powder coating equipment, dip coating machines, and turn-key solutions tailored to your needs.
Over the years, Zhyao has successfully built thousands of customized lines and systems for powder coating operations, serving clients across China and around the globe. Our commitment to continuous research, coupled with the expertise of our engineering department, ensures that we stay at the forefront of industry advancements. This allows our customers to modernize their equipment, whether partially or entirely, to enhance performance, boost profitability, and maintain a competitive edge in the global market.
Manual powder coating machine, Automatic powder coating line, Spray painting equipment, Pretreatment System, Drying Oven, Powder Spraying Gun, Reciprocator, Fast Automatic Color Change Equipment, Powder Coating Booth, Powder Recovery Equipment, Conveyor Chains, Curing Oven, etc. All the systems are widely used on the applications of automotive, home and office appliance, machines industry, metal fabrications and so on.And through to CE, ISO 9001 standards.
05 Customer Visiting
06 Our Team
07 After-sales Service
1. We will provide you with comprehensive guidelines, including device drawings, control circuit diagrams, and maintenance manuals.
2. We offer professional advice on scheduled maintenance to ensure optimal performance.
3. We fully supply resources for suitable industrial consumables, ensuring you never face disruptions due to a lack of materials.
4. Once installation is complete, we will assign qualified technicians to support you for 60 days.
5. If you need to upgrade your program, we can perform the work remotely with your permission.
6. For any questions or issues, we will provide solutions within 12 hours.
7. A 2-year warranty is guaranteed. This warranty includes free replacements if the Zhyao-designed equipment fails due to quality issues, provided there is no artificial damage.
At Zhyao, we are committed to delivering reliable support and ensuring your satisfaction throughout the entire lifecycle of our equipment.