24h technical and business service
30+ years experience in powder coating industry
200+ professional technicians, engineers and workers
300+ projects in China and around the world
To bring a customized SUCCESSFUL project for you!
Our Main Products:
Manual powder coating machine, Automatic powder coating line, Spray painting equipment, Pretreatment System, Drying Oven, Powder Spraying Gun, Reciprocator, Fast Automatic Color Change Equipment, Powder Coating Booth, Powder Recovery Equipment, Conveyor Chains, Curing Oven, etc. All the systems are widely used on the applications of automotive, home and office appliance, machines industry, metal fabrications and so on.And through to CE, ISO 9001 standards.
Pre-treatment:
Types: Immersion / spraying optional /shot blast
Customized design based on quality requirements:rinse, chemical degreasing, chemical rust removal, silane,pottery,phosphating, pure rinse,etc;
The shed is made of stainless steel, beautiful and durable, with a high degree of automation, and is equipped with a moisture drainage system to prevent solution overflow.
Curing/Drying oven
Curing oven system. Divided into bridge type curing oven and tunnel curing oven.
The tunnel curing oven effectively solves the problem of insufficient workshop height,
The tunnel furnace we produce has a wind curtain at both ends and the temperature of the furnace won't dissipate to the out, which saves the fuel. This is our patent.
The curing oven we produce saves fuel and saves your production. Curing oven insulation boards are all plug-in boards, seamless docking, heat bridge transfer technology.
Type |
Item |
Specification |
Bridge curing oven And Tunnel curing oven |
Conveyor chain speed |
Adjustment according to work piece specification |
Furnace temperature |
180-220°adjustable |
Heating time |
≤35mins,usually 15-20mins |
Temperature rise curve |
Work piece at room temperature to 200°,5-6mins,curing 10-12mins |
Heat energy |
Gas,electricity,LPG,diesel,multiple options |
Fast color change with big cyclone and secondry recovery system
advantages:
* Powder recovery rate as high as 99.2%
* Color change time: 10-15 minutes
* Suitable for multiple color more than 3
* No dust spillover, reduce powder waste
* Save labor time
* Improve the quality of spraying
Backpack recovery system features:
* Powder recovery rate: 98%
* Color change time: 15 minutes
* Reduce production stagnation time and increase productivity
* Advantages: Economical
* Disadvantages: Not suitable for multiple color change
Conveyor chains:
1.Easy to install and disassemble, low failure rate
2.PLC control, adjustable speed, suitable for different workpieces
Our company and certificates
ZhYao Intelligent Technology was established in 1995 and has nearly 30 years of experience in the spray equipment industry. From simple manual spraying to fully automatic intelligent powder spraying, from spray painting to electrostatic spraying to dip coating; our products cover all industries. Our company has 2 factories, 3 design departments, and an after-sales installation team of 80 people. The total number of employees exceeds 200. With our years of experience accumulation and technology research and development, we have the ability to provide customers with perfect, economical, reasonable and advanced solutions.
FAQ
1.Are you a trader or a factory?
We are manufacturer and exporter.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.
Feel free to contact with us to get your design .