Customization: | Available |
---|---|
Warranty: | 2 Year |
Powder Color: | Quick Change All Available |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Standard Service Flow
The Standard Process Situation of the Powder Coating Line
Process | Parameter | Mode | Remark | |
Temperature | Time | |||
Loading | RT | |||
Pretreatment | 35-50ºC | 15-20min | Automatic | Adjustable |
Drying | 100-120ºC | 15-20min | Automatic | Adjustable |
Cooling | RT | 5-10min | ||
Powder Coating | RT | 3-5min | Automatic and Manual | Adjustable |
Curing | 200-220ºC | 30-35min | Automatic | Adjustable |
Cooling | RT | 10-15min | ||
Unloading | RT |
What is your terms of packing?
Generally, we pack our goods by thicker bubble paper, some of them are packed by carton, and wooden box as required.
What is your terms of payment?
By T/T, 50% as deposit for production, and 50% balance before delivery. We'll show you the photos of the products and packages before you pay the balance. Other payment terms are as negotiated.
What is your terms of delivery?
Normally our quotation is under FOB Qingdao, but we also accept EXW, FOB(other seaports), CFR, CIF, DDU and so on.
What should I provide if interested in your powder coating equipment ?
A. The material/size(max)/weight(max)of your workpiece.
B. How many of your daily output(one day=8hours,one month=30days)?
C. What heating power do you prefer: electric, gas, diesel or coal?
D. The size of your factory(length, width and height)?