The process of Automatic powder coating line
No. |
Process Name |
Process Parameter |
Mode |
Remarks |
Temperature |
Time |
1 |
Loading |
RT |
|
|
|
2 |
Pre treatment |
35-50ºC |
15-20 min |
Automatic |
Adjustable |
3 |
Drying Oven |
100-120ºC |
15-20 min |
Automatic |
Adjustable |
4 |
Cooling |
RT |
5-10 min |
|
|
5 |
Powder coating |
RT |
3-5min |
Automatic and Manual |
Adjustable |
6 |
Curing |
200-220ºC |
30-35 min |
Automatic |
Adjustable |
7 |
Cooling |
RT |
10-15 min |
|
|
8 |
Unloading |
RT |
|
|
|
Large cyclone and secondary recovery system features:
* Powder recovery rate as high as 99.2%
* Color change time: 10-15 minutes
* Suitable for multiple color more than 3
* No dust spillover, reduce powder waste
* Save labor time
* Improve the quality of spraying
The process of recovery system
Our company and certificates
ZhYao Intelligent Technology was established in 1998 and has nearly 30 years of experience in the spray equipment industry. From simple manual spraying to fully automatic intelligent powder spraying, from spray painting to electrostatic spraying to dip coating; our products cover all industries. Our company has 2 factories, 3 design departments, and an after-sales installation team of 80 people. The total number of employees exceeds 200. With our years of experience accumulation and technology research and development, we have the ability to provide customers with perfect, economical, reasonable and advanced solutions.
FAQ
1.Are you a trader or a factory?
We are manufacturer and exporter.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.
Feel free to contact with us to get your design .