Customization: | Available |
---|---|
Application: | Aerospace Industry, Appliance Industry, Automotive Industry, Construction Industry, Electronics Industry, Furniture Industry |
Coating Type: | Electrostatic Coating |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Process | Parameter | Mode | Remark | |
Temperature | Time | |||
Loading | RT | |||
Pretreatment | 35-50ºC | 15-20min | Automatic | Adjustable |
Drying | 100-120ºC | 15-20min | Automatic | Adjustable |
Cooling | RT | 5-10min | ||
Powder Coating | RT | 3-5min | Automatic and Manual | Adjustable |
Curing | 200-220ºC | 30-35min | Automatic | Adjustable |
Cooling | RT | 10-15min | ||
Unloading | RT |
How is your company's after-sales service done?
A. Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B. After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C. If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D. Any problems with the equipment, our company guarantees to give solutions within 12 hours.
What is your terms of delivery?
Normally our quotation is under FOB Qingdao, but we also accept EXW, FOB(other seaports), CFR, CIF, DDU and so on.
What's your production cycle like?
Because our company is doing non-standard custom coating production line, in order to ensure the quality of the product, the production cycle of the order equipment is 60 working days, and the actual situation needs to be arranged according to the company's recent order volume.