Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts

Product Details
Customization: Available
Warranty: 2 Year
Booth: Tunnel Type, Walk-in Type, Mono-Cyclone Type
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Full Customization
The supplier provides full customization services
OEM Services
The supplier provides OEM services for popular brands
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (19)
  • Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts
  • Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts
  • Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts
  • Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts
  • Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts
  • Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts
Find Similar Products

Basic Info.

Model NO.
ZYS60609
Gun
Gema, Wagoner, Zhyao
Heating Method
Gas, Electricit, Diesel
Type
Electrostatic Spraying Equipment
Application
Hardware Spraying Equipment
Coating
Powder
Certification
CE, ISO
Method Type
Automatic
Condition
New
After-sales Service
Free Spare Parts, Field Installation, etc
Transport Package
Wooden Case
Specification
Customized
Trademark
Zhyao
Origin
China
HS Code
8424899990
Production Capacity
500 Set/Year

Product Description

The process of Automatic powder coating line
No. Process Name Process Parameter Mode Remarks
Temperature Time
1 Loading RT      
2 Pre treatment 35-50ºC 15-20 min Automatic Adjustable
3 Drying Oven 100-120ºC 15-20 min Automatic Adjustable
4 Cooling RT 5-10 min    
5 Powder coating RT 3-5min Automatic and Manual Adjustable
6 Curing 200-220ºC 30-35 min Automatic Adjustable
7 Cooling RT 10-15 min    
8 Unloading RT      
 
Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts
Dipping Pre-treatment

Immerse the workpiece in the paint
take it out after a certain period of time 
remove the excess paint on it
and dry it in a drying chamber 
or naturally dry it to form a film.
Fast Color Change Booth

Quick color  automatic change 10-15 minutes 
Multi-color change design
Higher Powder Recovery Efficiency  99.2%
No dust spill out, Minimum powder waste

 
Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts
Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts
Drying and Curing Oven

Patents saves the fuel
High security
Reasonable heating layout  
High efficiency
Less heat loss
 
Conveyor System

Energy saving
Space saving
Labor saving
Investment saving
Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts



Customized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal PartsCustomized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal PartsCustomized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal PartsCustomized Electrostatic Powder Coating Spraying Machine Equipment Wet Painting Line Metal Parts
FAQ

1.Are you a trader or a factory?

We are manufacturer and exporter.
Our own factory was found in 1995,Our export office was established in 2014.

2.What should I provide if interested in your powder coating equipment ?

A.The material/size/weight of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)
C.What heating power do you prefer: electric, gas, diesel or coal
D.The size of your factory(length, width and height)

3.How to ensure the quality of the equipment?

A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.

4.How to install equipment after purchasing your equipment?

A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.

5.How is your company's after-sales service done?

A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier