Electrostatic Powder Coating Machine and Oven

Product Details
Customization: Available
After-sales Service: Lifetime
Warranty: 2 Years Warranty
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Full Customization
The supplier provides full customization services
OEM Services
The supplier provides OEM services for popular brands
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (19)
  • Electrostatic Powder Coating Machine and Oven
  • Electrostatic Powder Coating Machine and Oven
  • Electrostatic Powder Coating Machine and Oven
  • Electrostatic Powder Coating Machine and Oven
  • Electrostatic Powder Coating Machine and Oven
  • Electrostatic Powder Coating Machine and Oven
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
Powder coating line
Type
Coating Production Line
Coating
Powder Coating
Substrate
Aluminum
Certification
CE, ISO
Condition
New
Heating Energy
Gas/Electricity/Diesel/LPG
Operation Method
Automatic
Transport Package
Metal Frame with Plastic Film
Specification
Customized
Trademark
ZHYAO
Origin
China
HS Code
8424300000
Production Capacity
20 Sets/Month

Product Description


Electrostatic Powder Coating Machine and Oven

Product Description

 
No. Process Name Process Parameter Mode Remarks
Temperature Time
1 Loading RT    Manual  
2 Pretreatment   8 -10minutes  Automatic
 
 
3 Drying Oven 100-120ºC 10-20 minutes Adjustable
4 Cooling   5-10 minutes  
5 Powder coating RT 1.5m/min  
6 Curing 180-220ºC 15-20 minutes Adjustable
7 Cooling RT 10-15 minutes  
8 Unloading RT   Manual  
Pretreatment system PP material: High corrosion resistence and light weight
PP powder booth:Duarable and easy to clean
Cyclone separator powder recycle system: Quick color change, shorten down time. Powder recovery rate>95%
Drying & Curing oven:
  • Uniform Heat Distribution: Curing ovens provide a consistent and controlled environment, ensuring even heat distribution across the product. This uniformity is critical for achieving consistent quality in the cured products.
  • Temperature Control: They allow precise temperature control, which is essential for materials that require specific curing conditions to achieve optimal properties.

Detailed Photos

Electrostatic Powder Coating Machine and Oven
Electrostatic Powder Coating Machine and Oven

 

Electrostatic Powder Coating Machine and Oven
Electrostatic Powder Coating Machine and Oven

Packaging & Shipping

Electrostatic Powder Coating Machine and Oven
Electrostatic Powder Coating Machine and Oven
Electrostatic Powder Coating Machine and Oven

 

Company Profile

Electrostatic Powder Coating Machine and Oven

FAQ

Partening for sucess: The overview of cooperate with ZHYAO

1.To determine the optimal technical solution with Zhyao
We employ a streamlined approach. We request customers to complete a Customer Needs Research Questionnaire. This enables us to swiftly comprehend their requirements and deliver tailored, cost-effective technical solutions. Upon agreement, we proceed to finalize the chosen solution and sign a contract, ensuring clarity and alignment between all parties involved.
 
2. Zhyao production process control and information synchronization 

Establish a project team with the customer (members include customer leaders, customer engineers, our project managers, our engineers, and our construction personnel, and provide each stage of the project schedule, videos, pictures and text to report the project progress to the customer.)
Electrostatic Powder Coating Machine and Oven

3.Packaging and transportation

Category packaging, labeling, and use of cargo packing lists will ensure that no goods are missed. Make packing plans in advance based on volume and weight before transportation to maximize container utilization and make the weight ratio reasonable, thereby reducing freight and improving safety. Cargo After arriving at the site, classify and place them according to the cargo list to facilitate later installation.

4.Installation
The installation process is controlled to ensure high-quality and efficient installation. 1. Preparation before installation and full communication with customers. 2. Initial stacking of goods according to the location of the spraying line upon arrival. 3. Effective communication during the installation process and reasonable matching (installation sequence Arrangements should be made as synchronized as possible depending on the customer's personnel situation and equipment installation sequence.

5. Verification
The verification part is divided into small test (partial installation can be trial run), initial test (empty test, without product), and final test (test run with product) to quickly enter production status.
During the verification process, 1-2 customer employees can be trained.

6.After sales service
Keep customer files permanently, and track product operation every month during the first year of installation. (Monthly communication helps customers better understand and use the equipment, and discover and solve potential problems.)
In the second year, we will visit customers periodically to learn about their use of equipment and track maintenance, and provide customers with help in advance for their consumable materials (reminding them of maintenance and replacement).
After three years, we will maintain communication at any time to assist customers in solving equipment upgrade and other needs.

 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier