Home
Product Directory
Manufacturing & Processing Machinery
Metallic Processing Machinery
Metal Coating Machinery
Powder Metal Coating Machinery
Gym Fittings Manual/Automatic Powder Spraying System/Powder Coating Line/Powder Painting Machine Manufacture
Port:
Tianjin, China
Production Capacity:
20 Sets/ Month
Payment Terms:
T/T, D/P
Hebei Zhanyao Intelligent Equipment Technology Co., Ltd.
Hebei, China
Last Login Date:
Aug 11, 2025
Main Products:
Powder Coating Line, Automatic Powder Coating Line, Industrial Powder Coating Line, Powder Coat System, Vertical Powder Coating Line, Electrostatic Powder Coating Line, Horizontal Powder Coating Line, Powder Coating Equipment, Painting Line, Powder Coating Machine
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
powder coating line
After-sales Service
Video and Overseas Service
Warranty
2 Years
Type
Coating Production Line
Coating
Powder Coating
Substrate
Steel
Certification
CE, ISO
Condition
New
Control
PLC Touch Screen
Spray Gun
Gema/Dber
Oven Insulation Material
150mm Rock Wool
Recovery
Cyclone+Filters
Heating Energy
Gas/LPG/Diesel
Usage
More Than 10 Years
Reciprocator
Design Matching
Trademark
ZhYao
Transport Package
Customized
Origin
China
HS Code
8424300000
Product Description
The process of automatic line
No. | Process Name | Process Parameter | Mode | Remarks | |
Temperature | Time | ||||
1 | Loading | RT | |||
2 | Pre treatment | 35-50ºC | 15-20 min | Automatic | Adjustable |
3 | Drying Oven | 100-120ºC | 15-20 min | Automatic | Adjustable |
4 | Cooling | RT | 5-10 min | ||
5 | Powder coating | RT | 3-5min | Automatic and Manual | Adjustable |
6 | Curing | 200-220ºC | 30-35 min | Automatic | Adjustable |
7 | Cooling | RT | 10-15 min | ||
8 | Unloading | RT |
Pre-treatment:
The shed is made of stainless steel, beautiful and durable, with a high degree of automation, and is equipped with a moisture drainage system to prevent solution overflow.
Powder Coating Booth
fast color change with big cyclone and secondry recovery system
advantages:
* Powder recovery rate as high as 99.2%
* Color change time: 10-15 minutes
* Suitable for multiple color more than 3
* No dust spillover, reduce powder waste
* Save labor time
* Improve the quality of spraying
About us and certificates
ZhYao Intelligent Technology provides excellent services to customers such as manufacturers at all levels, government departments, and multinational trading companies. Completed projects are located all over the world, including China, Bulgaria, Algeria, Croatia, the United Kingdom, Switzerland, New Zealand, Chile, Morocco, Qatar, Saudi Arabia, etc.The shed is made of stainless steel, beautiful and durable, with a high degree of automation, and is equipped with a moisture drainage system to prevent solution overflow.
Powder Coating Booth
fast color change with big cyclone and secondry recovery system
advantages:
* Powder recovery rate as high as 99.2%
* Color change time: 10-15 minutes
* Suitable for multiple color more than 3
* No dust spillover, reduce powder waste
* Save labor time
* Improve the quality of spraying
About us and certificates
FAQ
1.Are you a trader or a factory?
We are manufacturer and exporter.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.
Feel free to contact with us to get your design .
Send your message to this supplier
People who liked this also liked