The process of automatic line
No. |
Process Name |
Process Parameter |
Mode |
Remarks |
Temperature |
Time |
1 |
Loading |
RT |
|
|
|
2 |
Pre treatment |
35-50ºC |
15-20 min |
Automatic |
Adjustable |
3 |
Drying Oven |
100-120ºC |
15-20 min |
Automatic |
Adjustable |
4 |
Cooling |
RT |
5-10 min |
|
|
5 |
Powder coating |
RT |
3-5min |
Automatic and Manual |
Adjustable |
6 |
Curing |
200-220ºC |
30-35 min |
Automatic |
Adjustable |
7 |
Cooling |
RT |
10-15 min |
|
|
8 |
Unloading |
RT |
|
|
|
Pre-treatment:
Types: Immersion / spraying optional /shot blast
Customized design based on quality requirements:rinse, chemical degreasing, chemical rust removal, silane,pottery,phosphating, pure rinse,etc;
The shed is made of stainless steel, beautiful and durable, with a high degree of automation, and is equipped with a moisture drainage system to prevent solution overflow.
Powder Coating System:
Robot automatic spraying, faster, consistent layer thickness, can be programmed offline, easy to control, greatly saving costs.
About our company and certifacates
ZhYao Intelligent Technology Company has a complete range of products, which are widely used in wire mesh, guardrails, aluminum profiles, metal cabinets, hardware tools, household appliances, warehousing facilities, sporting goods, metal castings, engineering machinery, construction fences, logistics equipment, petroleum natural gas pipelines and many other fields.
ZhYao Intelligent Technology Company insists on independent innovation and has more than 200 new patents; it insists on people-oriented and has 20 R&D design engineers; the company philosophy is quality first, customers first; trust in ZhYao, let ZhYao work with you for win-win cooperation!
FAQ
1.Are you a trader or a factory?
We are manufacturer and exporter.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.
Feel free to contact with us to get your design .