• Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
  • Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
  • Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
  • Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
  • Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
  • Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory

Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory

After-sales Service: Video and Overseas Service
Warranty: 2 Years
Type: Coating Production Line
Coating: Powder Coating
Substrate: Steel
Certification: CE, ISO
Customization:
Manufacturer/Factory

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Hebei, China
Importers and Exporters
The supplier has import and export rights
Full Customization
The supplier provides full customization services
OEM Services
The supplier provides OEM services for popular brands
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (19)
  • Overview
  • Product Description
  • The recovery system
  • Detailed Photos
  • Product Parameters
  • Company Profile
  • Certifications
  • Packaging & Shipping
Overview

Basic Info.

Model NO.
ZYB-01
Condition
New
Heating Energy
Gas/LPG/Diesel/Electric
Recovery
Filters+Cyclone
Booth Material
PVC/PP
Oven Insulation Material
150mm Rock Wool
Spray Gun
Gema/Dber
Control
PLC Touch Screen
Usage
More Than 10 Years
Package
Wooden Case Mental Frame
Workpiece
Mental,Plastic,etc
Operate Mode
Auto,Semi-Auto,Manual
Pretreatment
Spray,Paint,Immersion
Transport Package
Customized
Specification
Design matching
Trademark
ZhYao
Origin
China
HS Code
8424300000
Production Capacity
2 Sets/ Month

Product Description

Product Description

 

Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory24h technical and business service
30+ years experience in powder coating industry
200+ professional technicians, engineers and workers
300+ projects in China and around the world


To bring a customized SUCCESSFUL project for you! 

The recovery system


 

Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
Large cyclone and secondary recovery system features:
* Powder recovery rate as high as 99.2%  
* Color change time: 10-15 minutes 
* Suitable for multiple color more than 3
* No dust spillover, reduce powder waste 
* Save labor time
* Improve the quality of spraying  
Backpack recovery system features:
* Powder recovery rate: 98%
* Color change time: 15 minutes
* Reduce production stagnation time and increase productivity
* Advantages: Economical
* Disadvantages: Not suitable for multiple color change

 
Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
 
Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
Curing/Drying oven
Curing oven system. Divided into bridge type curing oven and tunnel curing oven.
The tunnel curing oven effectively solves the problem of insufficient workshop height, 
The tunnel furnace we produce has a wind curtain at both ends and the temperature of the furnace won't dissipate to the out, which saves the fuel. This is our patent.
The curing oven we produce saves fuel and saves your production. Curing oven insulation boards are all plug-in boards, seamless docking, heat bridge transfer technology.

 

 

 
Pre-treatment:
Types: Immersion / spraying optional /shot blast
Customized design based on quality requirements:rinse, chemical degreasing, chemical rust removal, silane,pottery,phosphating, pure rinse,etc; 
The shed is made of stainless steel, beautiful and durable, with a high degree of automation, and is equipped with a moisture drainage system to prevent solution overflow.

 
Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
 
Detailed Photos

 

Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
 
Product Parameters
 
No. Process Name Process Parameter Mode Remarks
Temperature Time
1 Loading RT      
2 Pre treatment 35-50ºC 15-20 min Automatic Adjustable
3 Drying Oven 100-120ºC 15-20 min Automatic Adjustable
4 Cooling RT 5-10 min    
5 Powder coating RT 3-5min Automatic and Manual Adjustable
6 Curing 200-220ºC 30-35 min Automatic Adjustable
7 Cooling RT 10-15 min    
8 Unloading RT      
Company Profile

Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory

 

ZhYao Intelligent Equipment Technology was established in 1995 and has nearly 30 years of experience in the spray equipment industry. We are the top 3 in the Powder Spraying industry. From simple manual spraying to fully automatic intelligent powder spraying, from spray painting to electrostatic spraying to dip coating; our products cover all industries. Our company has 2 factories, 3 design departments, and an after-sales installation team of 80 people. The total number of employees exceeds 200. With our years of experience accumulation and technology research and development, we have the ability to provide customers with perfect, economical, reasonable and advanced solutions.
Certifications

 

Powder Coating Recovery System Manufacture/Powder Spreading Booth FactoryPowder Coating Recovery System Manufacture/Powder Spreading Booth Factory
Packaging & Shipping

 


Powder Coating Recovery System Manufacture/Powder Spreading Booth Factory
FAQ

1.Are you a trader or a factory?
We are manufacturer and exporter.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.


Feel free to contact with us to get your design .

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
76
Year of Establishment
2022-09-29