消息
×
loading..
x

Fully Automatic Powder Coating Booth with Automatic and Manual Powder Spray Guns

US$80,000.00
1 Set
US$75,000.00
2+ Sets
Port:
Tianjin, China
Production Capacity:
80 Sets/ Year
Payment Terms:
T/T

Last Login Date:

Aug 11, 2025

Main Products:

Powder Coating Line, Automatic Powder Coating Line, Industrial Powder Coating Line, Powder Coat System, Vertical Powder Coating Line, Electrostatic Powder Coating Line, Horizontal Powder Coating Line, Powder Coating Equipment, Painting Line, Powder Coating Machine

Find Similar Products
US$5,500.00-6,400.00
1 Set (MOQ)

Product Description

Company Info

Basic Info.

Model NO.
ZYS-064
Application
Aerospace Industry, Appliance Industry, Automotive Industry, Construction Industry, Electronics Industry, Furniture Industry
Coating Type
Powder Coating
Heating system
Diesel, electric, gas, LPG
Warranty
2 Years
Certification
CE, ISO
Substrate
Steel
Recovery
Filters+Cyclone
Powder Recovery
99.2%
Maintenance
Easy, Lower Cost
After Sales
Online / on-Site Service
Trademark
ZHYAO
Transport Package
Metal Frame and Plastic Film
Specification
Customized
Origin
China
HS Code
8424300000

Product Description

Project NamePowder coating boothBooth MaterialPVC/PP
Oven Insulation Material150mm Rock WoolApplicationPowder coating system,painting system
Spray GunGema/DberOriginChina,Japan
ControlZHYAOHS Code8424300000
UsageMore Than 10 YearsOperate ModeAuto,Semi-Auto,Manual
Product Description
On-site Product Display

Certifications

Cooperative Client

Packaging & Shipping

 

After Sales Service

FAQ

1.Are you a trader or a factory?
We are manufacturer and exporter.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2018 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.

Feel free to contact with us to get your design !

Send your message to this supplier
Mr. Daniel

Post a Sourcing Request Now

People who liked this also liked