消息
×
loading..
x

Automated Powder Coating Equipment for Pressure Metal Tanks

US$300,000.00
1-4 Sets
US$270,000.00
5+ Sets
Port:
Tianjin, China
Production Capacity:
100 Set/Year
Payment Terms:
L/C, T/T

Last Login Date:

Aug 11, 2025

Main Products:

Powder Coating Line, Automatic Powder Coating Line, Industrial Powder Coating Line, Powder Coat System, Vertical Powder Coating Line, Electrostatic Powder Coating Line, Horizontal Powder Coating Line, Powder Coating Equipment, Painting Line, Powder Coating Machine

Find Similar Products
US$25,000.00
1 Piece (MOQ)

Product Description

Company Info

Basic Info.

Model NO.
ZYA01
Application
Furniture Industry, Hardware Spraying Equipment
Coating Type
Powder Coating
Heating system
gas
Warranty
1 Year
Booth
Tunnel Type, Walk-in Type, Mono-Cyclone Type
Oven
Bridge Type, Tunnel Type, Box Type
Gun
Gema, Debelle
Heating Method
Gas, Electricit, Diesel
Type
Electrostatic Spraying Equipment
Coating
Powder
Certification
CE, ISO
Method Type
Automatic
Condition
New
After-Sales Service
Free Spare Parts, Field Installation, etc
Trademark
Zhyao
Transport Package
Metal Structure, Wooden Caase
Specification
Customized
Origin
China
HS Code
8424899990

Product Description

Product Description

Certifications

Packaging & Shipping

After Sales Service

FAQ


1.Are you a trader or a factory?

We are manufacturer .
Our own factory was found in 1995,Our export office was established in 2014.

2.What should I provide if interested in your powder coating equipment ?

A.The material/size/weight of your workpiece.
B.What is your daily output(8hrs)
C.Which heating power do you prefer: electric, gas or diesel
D.The size of your factory plant (length, width and height)

3.How to guarantee the quality of the equipment?

A.We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B.The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C.We manning quality inspectors specially to control the processing quality of product strictly.

4.Installation :


A.We will provide installation information and installation videos
B.Our engineers will guide the installation and run the equipment. 
C.After the debugging, will provide complete training and track customer device usage.

5.How about after-sales service?

Provide training for operation and maintenance personnel.

Regularly track the performance and effects.
Assist customers with production process management.
The equipment warranty period is one year.
Free replacement of parts during the warranty period.
Lifelong after-sales service.
Provide consumable parts at ex-factory price.

 
Send your message to this supplier
Mr. Daniel

Post a Sourcing Request Now

People who liked this also liked
Get Quick Quotes