Automatic Powder Coating Line for Iron Cabinet Backing Plate

US$26,000.00
1-4 Sets
US$23,000.00
5+ Sets
Port:
Tianjin, China
Production Capacity:
500 Set/Year
Payment Terms:
L/C, T/T

Last Login Date:

Aug 11, 2025

Main Products:

Powder Coating Line, Automatic Powder Coating Line, Industrial Powder Coating Line, Powder Coat System, Vertical Powder Coating Line, Electrostatic Powder Coating Line, Horizontal Powder Coating Line, Powder Coating Equipment, Painting Line, Powder Coating Machine

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
ZYS52720
Application
Hardware Spraying Equipment
Coating Type
Powder Coating
Warranty
2 Year
Booth
Tunnel Type, Walk-in Type, Mono-Cyclone Type
Oven
Bridge Type, Tunnel Type, Box Type
Gun
Gema, Wagoner, Zhyao
Heating Method
Gas, Electricit, Diesel
Type
Electrostatic Spraying Equipment
Coating
Powder
Certification
CE, ISO
Method Type
Automatic
Condition
New
After-sales Service
Free Spare Parts, Field Installation, etc
Trademark
Zhyao
Transport Package
Wooden Case
Specification
Customized
Origin
China
HS Code
8424899990

Product Description

The process of Automatic powder coating line
No.Process NameProcess ParameterModeRemarks
TemperatureTime
1LoadingRT   
2Pre treatment35-50ºC15-20 minAutomaticAdjustable
3Drying Oven 100-120ºC15-20 minAutomaticAdjustable
4Cooling RT5-10 min  
5Powder coatingRT3-5minAutomatic and ManualAdjustable
6Curing200-220ºC30-35 minAutomatic Adjustable
7CoolingRT10-15 min  
8UnloadingRT   
FAQ

1.Are you a trader or a factory?

We are manufacturer and exporter.
Our own factory was found in 1995,Our export office was established in 2014.

2.What should I provide if interested in your powder coating equipment ?

A.The material/size/weightof your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)
C.What heating power do you prefer: electric, gas, diesel or coal
D.The size of your factory(length, width and height)

3.How to ensure the quality of the equipment?

A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.

4.How to install equipment after purchasing your equipment?

A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.

5.How is your company's after-sales service done?

A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.


 
Send your message to this supplier
Mr. Daniel

Post a Sourcing Request Now

People who liked this also liked
Get Quick Quotes