Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes

Product Details
Customization: Available
After-sales Service: Video and Overseas Service
Warranty: 2 Years
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Full Customization
The supplier provides full customization services
OEM Services
The supplier provides OEM services for popular brands
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (19)
  • Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes
  • Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes
  • Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes
  • Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes
  • Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes
  • Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes
Find Similar Products
  • Overview
  • The spraying booth
  • The process of automatic line
  • The recovery system
  • Detailed Photos
Overview

Basic Info.

Model NO.
powder coating line
Coating
Powder Coating
Substrate
Steel
Certification
CE, ISO
Condition
New
Control
PLC Touch Screen
Oven Insulation Material
150mm Rock Wool
Spray Gun
Gema/Dber
Booth Material
PVC/PP
Usage
More Than 10 Years
Recovery
Cyclone+Filter
Transport Package
Customized
Trademark
ZhYao
Origin
China
HS Code
8424300000
Production Capacity
5 Sets/ Month

Product Description

Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes

The spraying booth
Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes
Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes

 

The process of automatic line
 
No. Process Name Process Parameter Mode Remarks
Temperature Time
1 Loading RT      
2 Pre treatment 35-50ºC 15-20 min Automatic Adjustable
3 Drying Oven 100-120ºC 15-20 min Automatic Adjustable
4 Cooling RT 5-10 min    
5 Powder coating RT 3-5min Automatic and Manual Adjustable
6 Curing 200-220ºC 30-35 min Automatic Adjustable
7 Cooling RT 10-15 min    
8 Unloading RT      
The recovery system

 

Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes
Detailed Photos
Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes
Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes

The recovery system
Large cyclone and secondary recovery system features:
* Powder recovery rate as high as 99.2%  
* Color change time: 10-15 minutes 
* Suitable for multiple color more than 3
* No dust spillover, reduce powder waste 
* Save labor time
* Improve the quality of spraying  

Our company and certificates
Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium PipesZhYao Intelligent Technology was established in 1995 and has nearly 30 years of experience in the spray equipment industry.  From simple manual spraying to fully automatic intelligent powder spraying, from spray painting to electrostatic spraying to dip coating; our products cover all industries. Our company has 2 factories, 3 design departments, and an after-sales installation team of 80 people. The total number of employees exceeds 200. With our years of experience accumulation and technology research and development, we have the ability to provide customers with perfect, economical, reasonable and advanced solutions.
Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium PipesVertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium Pipes
Vertical Auto Powder Coating Line/Spray Machine Supplier for Aluminium PipesFAQ
1.Are you a trader or a factory?

We are manufacturer and exporter.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.

Feel free to contact with us to get your design .

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier