High Efficiency Powder Coating Booth with Cyclone Recovery System

Product Details
Customization: Available
Application: Aerospace Painting, Automotive Refinishing, Furniture Finishing, Industrial Coating, Metal Fabrication, Metal Products Powder Coating Booth
Certification: CE, ISO
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Full Customization
The supplier provides full customization services
OEM Services
The supplier provides OEM services for popular brands
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (19)
  • High Efficiency Powder Coating Booth with Cyclone Recovery System
  • High Efficiency Powder Coating Booth with Cyclone Recovery System
  • High Efficiency Powder Coating Booth with Cyclone Recovery System
  • High Efficiency Powder Coating Booth with Cyclone Recovery System
  • High Efficiency Powder Coating Booth with Cyclone Recovery System
  • High Efficiency Powder Coating Booth with Cyclone Recovery System
Find Similar Products
  • Overview
  • Product Description
  • The recovery system
  • Detailed Photos
  • Product Parameters
  • Company Profile
  • Certifications
  • Packaging & Shipping
Overview

Basic Info.

Model NO.
ZYR-05
Filters
Cartridge Filters
Voltage
380V
Warranty
2 Years Spare Parts for Free
Control
PLC Touch Screen
Spray Gun
Gema/Debelle, Zhyao
Control System
Siemens
Oven Insulation Material
150mm Rock Wool
Pretreatment Type
Spray/Immersion/Shot Blasting
Booth Material
PVC/PP
Recovery
Cyclone+Filters
Heating Energy
Gas/LPG/Diesel/Electricity
Reciprocator
Design Matching
Type
Electrostatic Spraying Equipment
Coating
Powder
Method Type
Automatic
Condition
New
After-Sales Service
Video and Overseas Service
Transport Package
Metal Frame and Plastic Film
Specification
Design matching
Trademark
ZhYao
Origin
Shijiazhuang City, Hebei, China
HS Code
8424300000
Production Capacity
5 Sets/ Month

Product Description

Product Description

High Efficiency Powder Coating Booth with Cyclone Recovery System
The powder coating booth is made of PP board,looks beautiful,anti-static,the powder will not adsorbed on the surface;in the bottom of the booth ,there is compressed air to blow the powder into the recovery system;in this way it allows workers to clean the booth quickly;there is a centrifugal fan which creates negative air pressure,under the negative pressure the powder can not spill over out,ensure the clean working environment;


How does the powder run in the system?

High Efficiency Powder Coating Booth with Cyclone Recovery System

The recovery system

 

High Efficiency Powder Coating Booth with Cyclone Recovery System
Large cyclone and secondary recovery system features:
* Powder recovery rate as high as 99.2%  
* Color change time: 10-15 minutes 
* Suitable for multiple color more than 3
* No dust spillover, reduce powder waste 
* Save labor time
* Improve the quality of spraying  
Backpack recovery system features:
* Powder recovery rate: 98%
* Color change time: 15 minutes
* Reduce production stagnation time and increase productivity
* Advantages: Economical
* Disadvantages: Not suitable for multiple color change

 
High Efficiency Powder Coating Booth with Cyclone Recovery System
 

 

Detailed Photos

There are lifters on both sides of the powder coating booth,the spraying guns are installed on the lifters;the lifers is PLC controlled,can move up and down,left and right,even in circle,the Moving Path depend on the workpiece;before the powder coating booth,there are scanners in the post which can scan the workpiece, so the dimension of the workpiece can transport to the control system, which produce an order to the lifter, the whole process is fully automatically.
And there is a shaking machine in the powder supply center,when the powder comes out of the cyclone,enters the shaking machine, in this machine,a filter in it,through shaking and moving ,the powder becomes clean.then for reuse.

High Efficiency Powder Coating Booth with Cyclone Recovery System
High Efficiency Powder Coating Booth with Cyclone Recovery System
 
Product Parameters
Fast auto color change Powder coating booth Parameters Fast auto color change Powder coating booth Parameters
Material of the booth PP or PVC Powder recovery system Large cyclone with secondary recovery unit
Size of the booth Design matching Powder recovery rate 99.2%
Reciprocator Design matching Powder recovery time 10-15 mins
Powder coating gun Gema,Nordson,ZY Size of the large cyclone Φ1m,H4.8m,customized
Lighting LED Electrical control center Design matching
Company Profile

High Efficiency Powder Coating Booth with Cyclone Recovery System

24h technical and business service
30+ years experience in powder coating industry
200+ professional technicians, engineers and workers
300+ projects in China and around the world


To bring a customized SUCCESSFUL project for you! 

ZhYao Intelligent Equipment Technology was established in 1998 and has nearly 30 years of experience in the spray equipment industry. We are the top 3 in the Powder Spraying industry. From simple manual spraying to fully automatic intelligent powder spraying, from spray painting to electrostatic spraying to dip coating; our products cover all industries. Our company has 2 factories, 3 design departments, and an after-sales installation team of 80 people. The total number of employees exceeds 200. With our years of experience accumulation and technology research and development, we have the ability to provide customers with perfect, economical, reasonable and advanced solutions.
Certifications

 

High Efficiency Powder Coating Booth with Cyclone Recovery SystemHigh Efficiency Powder Coating Booth with Cyclone Recovery System
Packaging & Shipping

 


High Efficiency Powder Coating Booth with Cyclone Recovery System
FAQ

1.Are you a trader or a factory?
We are manufacturer and exporter.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.


Feel free to contact with us to get your design .
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier