Customization: | Available |
---|---|
After-sales Service: | Free Spare Parts Installation Instruct |
Warranty: | 2 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Standard Service Flow
The Standard Process Situation of the Powder Coating Line
Process | Parameter | Mode | Remark | |
Temperature | Time | |||
Loading | RT | |||
Pretreatment | 35-50ºC | 15-20min | Automatic | Adjustable |
Drying | 100-120ºC | 15-20min | Automatic | Adjustable |
Cooling | RT | 5-10min | ||
Powder Coating | RT | 3-5min | Automatic and Manual | Adjustable |
Curing | 200-220ºC | 30-35min | Automatic | Adjustable |
Cooling | RT | 10-15min | ||
Unloading | RT |
Are you a trader or a factory?
We are manufacturer and exporter.
Our own factory was found in 1995,Our export office was established in 2014.
How to ensure the quality of the equipment?
A. We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B. The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C. We manning quality inspectors specially to control the processing quality of product strictly.
How to install equipment after purchasing your equipment?
A. We will provide installation information and installation videos
B. Our engineers will guide the installation and run the equipment.
C. After the debugging, will provide complete training and track customer device usage.
How do you make our business long-term and good relationship?
A. We keep good quality and competitive price to ensure our customers benefit;
B. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from