Turnkey Solution Electrostatic Powder Coating Line Hot Selling SGS Standard Professional
Hebei Zhanyao Intelligent Equipment Technology Co., Ltd.
Hebei, China
Last Login Date:
Aug 11, 2025
Main Products:
Powder Coating Line, Automatic Powder Coating Line, Industrial Powder Coating Line, Powder Coat System, Vertical Powder Coating Line, Electrostatic Powder Coating Line, Horizontal Powder Coating Line, Powder Coating Equipment, Painting Line, Powder Coating Machine
Product Description
Company Info
Basic Info.
Product Description
The process and layout are available to adjust anytime according to your requirements.
In ZHYAO Technology All types of the conveying chains and rails are available here, we can design and choose the most suitable pattern for you.
Through 30 years' experience and our chemists, ZHYAO Technology has our own advanced technology to pretreat the workpiece, because of which, our production line can produce the stable and varieble coatings.
The recovery system of the powder are 2-step pattern. The powder utilization rate can reach 99.2%.
All the departed device are convenient to assemble in your site and the strength won't be weakened. The well done project will run smoothly in 10 days after arrival.
The Standard Service Flow
The Standard Process Situation of the Powder Coating Line
Process | Parameter | Mode | Remark | |
Temperature | Time | |||
Loading | RT | |||
Pretreatment | 35-50ºC | 15-20min | Automatic | Adjustable |
Drying | 100-120ºC | 15-20min | Automatic | Adjustable |
Cooling | RT | 5-10min | ||
Powder Coating | RT | 3-5min | Automatic and Manual | Adjustable |
Curing | 200-220ºC | 30-35min | Automatic | Adjustable |
Cooling | RT | 10-15min | ||
Unloading | RT |
why should you buy from us not from other suppliers?
Our company has more than 10 years of experience in electrostatic spraying industry, and can provide customers with various complex spraying solutions and best services, including: spraying machine, spray gun, spray room, etc
How to ensure the quality of the equipment?
A. We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B. The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C. We manning quality inspectors specially to control the processing quality of product strictly.
How to install equipment after purchasing your equipment?
A. We will provide installation information and installation videos
B. Our engineers will guide the installation and run the equipment.
C. After the debugging, will provide complete training and track customer device usage.
How is your company's after-sales service done?
A. Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B. After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C. If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D. Any problems with the equipment, our company guarantees to give solutions within 12 hours.