Customization: | Available |
---|---|
Warranty: | 2 Year |
Powder Color: | Quick Change All Available |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Standard Service Flow
The Standard Process Situation of the Powder Coating Line
Process | Parameter | Mode | Remark | |
Temperature | Time | |||
Loading | RT | |||
Pretreatment | 35-50ºC | 15-20min | Automatic | Adjustable |
Drying | 100-120ºC | 15-20min | Automatic | Adjustable |
Cooling | RT | 5-10min | ||
Powder Coating | RT | 3-5min | Automatic and Manual | Adjustable |
Curing | 200-220ºC | 30-35min | Automatic | Adjustable |
Cooling | RT | 10-15min | ||
Unloading | RT |
Are you a trader or a factory?
We are manufacturer and exporter.
Our own factory was found in 1995,Our export office was established in 2014.
What should I provide if interested in your powder coating equipment ?
A. The material/size(max)/weight(max)of your workpiece.
B. How many of your daily output(one day=8hours,one month=30days)?
C. What heating power do you prefer: electric, gas, diesel or coal?
D. The size of your factory(length, width and height)?
How to install equipment after purchasing your equipment?
A. We will provide installation information and installation videos
B. Our engineers will guide the installation and run the equipment.
C. After the debugging, will provide complete training and track customer device usage.
What's your production cycle like?
Because our company is doing non-standard custom coating production line, in order to ensure the quality of the product, the production cycle of the order equipment is 60 working days, and the actual situation needs to be arranged according to the company's recent order volume.
What is your terms of payment?
By T/T, 50% as deposit for production, and 50% balance before delivery. We'll show you the photos of the products and packages before you pay the balance. Other payment terms are as negotiated.