Electrostatic Powder Coating Line with Quick Color Change Powder Booth and Automated Conveyor

US$26,000.00
1-4 Sets
US$19,000.00
5+ Sets
Port:
Tianjin, China
Production Capacity:
500 Set/Year
Payment Terms:
L/C, T/T

Last Login Date:

Aug 11, 2025

Main Products:

Powder Coating Line, Automatic Powder Coating Line, Industrial Powder Coating Line, Powder Coat System, Vertical Powder Coating Line, Electrostatic Powder Coating Line, Horizontal Powder Coating Line, Powder Coating Equipment, Painting Line, Powder Coating Machine

Find Similar Products
US$58,000.00-580,000.00
1 Set (MOQ)
US$36,800.00-136,800.00
1 Piece (MOQ)
US$4,100.00-4,500.00
1 Piece (MOQ)
US$2,200.00-2,300.00
1 Piece (MOQ)

Product Description

Company Info

Basic Info.

Model NO.
Automated powder coating line
Application
Hardware Spraying Equipment
Coating Type
Powder Coating
Warranty
2 Year
Booth
Tunnel Type, Walk-in Type, Mono-Cyclone Type
Oven
Bridge Type, Tunnel Type, Box Type
Gun
Gema, Wagoner, Zhyao
Heating Method
Gas, Electricit, Diesel
Type
Electrostatic Spraying Equipment
Coating
Powder
Certification
CE, ISO
Method Type
Automatic
Condition
New
After-Sales Service
Free Spare Parts, Field Installation, etc
Trademark
Zhyao
Transport Package
Wooden Case
Specification
Customized
Origin
China
HS Code
8424899990

Product Description

The process of Automatic powder coating line
No.Process NameProcess ParameterModeRemarks
TemperatureTime
1LoadingRT   
2Pre treatment35-50ºC15-20 minAutomaticAdjustable
3Drying Oven 100-120ºC15-20 minAutomaticAdjustable
4Cooling RT5-10 min  
5Powder coatingRT3-5minAutomatic and ManualAdjustable
6Curing200-220ºC30-35 minAutomatic Adjustable
7CoolingRT10-15 min  
8UnloadingRT   

Partening for sucess: The overview of cooperate with ZHYAO
1.To determine the optimal technical solution with Zhyao
We employ a streamlined approach. We request customers to complete a Customer Needs Research Questionnaire. This enables us to swiftly comprehend their requirements and deliver tailored, cost-effective technical solutions. Upon agreement, we proceed to finalize the chosen solution and sign a contract, ensuring clarity and alignment between all parties involved.
 
2. Zhyao production process control and information synchronization 
Establish a project team with the customer (members include customer leaders, customer engineers, our project managers, our engineers, and our construction personnel, and provide each stage of the project schedule, videos, pictures and text to report the project progress to the customer.)

 
3.Packaging and transportation
Category packaging, labeling, and use of cargo packing lists will ensure that no goods are missed. Make packing plans in advance based on volume and weight before transportation to maximize container utilization and make the weight ratio reasonable, thereby reducing freight and improving safety. Cargo After arriving at the site, classify and place them according to the cargo list to facilitate later installation.

4.Installation
The installation process is controlled to ensure high-quality and efficient installation. 1. Preparation before installation and full communication with customers. 2. Initial stacking of goods according to the location of the spraying line upon arrival. 3. Effective communication during the installation process and reasonable matching (installation sequence Arrangements should be made as synchronized as possible depending on the customer's personnel situation and equipment installation sequence.

5. Verification
The verification part is divided into small test (partial installation can be trial run), initial test (empty test, without product), and final test (test run with product) to quickly enter production status.
During the verification process, 1-2 customer employees can be trained.

6.After sales service
Keep customer files permanently, and track product operation every month during the first year of installation. (Monthly communication helps customers better understand and use the equipment, and discover and solve potential problems.)
In the second year, we will visit customers periodically to learn about their use of equipment and track maintenance, and provide customers with help in advance for their consumable materials (reminding them of maintenance and replacement).
After three years, we will maintain communication at any time to assist customers in solving equipment upgrade and other needs


FAQ

1.Are you a trader or a factory?

We are manufacturer and exporter.
Our own factory was found in 1995,Our export office was established in 2014.

2.What should I provide if interested in your powder coating equipment ?

A.The material/size/weight of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)
C.What heating power do you prefer: electric, gas, diesel or coal
D.The size of your factory(length, width and height)

3.How to ensure the quality of the equipment?

A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.

4.How to install equipment after purchasing your equipment?

A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.

5.
 How does the powder coating process work?

 The process involves three main steps: pre-treatment, electrostatic powder deposition, and curing. The charged powder adheres to the surface and is melted to form a smooth, even coating.





 
Send your message to this supplier

Post a Sourcing Request Now

People who liked this also liked