Customization: | Available |
---|---|
Warranty: | 2 Year |
Powder Color: | Quick Change All Available |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Standard Service Flow
The Standard Process Situation of the Powder Coating Line
Process | Parameter | Mode | Remark | |
Temperature | Time | |||
Loading | RT | |||
Pretreatment | 35-50ºC | 15-20min | Automatic | Adjustable |
Drying | 100-120ºC | 15-20min | Automatic | Adjustable |
Cooling | RT | 5-10min | ||
Powder Coating | RT | 3-5min | Automatic and Manual | Adjustable |
Curing | 200-220ºC | 30-35min | Automatic | Adjustable |
Cooling | RT | 10-15min | ||
Unloading | RT |
What is your terms of packing?
Generally, we pack our goods by thicker bubble paper, some of them are packed by carton, and wooden box as required.
What is your terms of payment?
By T/T, 50% as deposit for production, and 50% balance before delivery. We'll show you the photos of the products and packages before you pay the balance. Other payment terms are as negotiated.
What is your terms of delivery?
Normally our quotation is under FOB Qingdao, but we also accept EXW, FOB(other seaports), CFR, CIF, DDU and so on.
How to ensure the quality of the equipment?
A. We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B. The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C. We manning quality inspectors specially to control the processing quality of product strictly.